[1]张毕西. 基于订单生产的计划投产量决策,系统工程理论与实践,2008,vol.25, p51-55(EI收录: 083411474637);
[2]张毕西. 考虑出入口距离的设施布置优化研究,系统工程理论与实践,2004.11,39-44(EI收录2004528745521);
[3]张毕西. 多对象生产系统设备多行布置优化,系统工程与电子技术,2004.6,754-757;
[4]张毕西. 基于作业成本的制造商利润优化模型,系统工程,2007.2 vol.25, p51-55;
[5]张毕西. 中小型制造企业工人薪酬平衡与调整,工业工程,2005.6;
[6]张毕西. 非流水型生产调度的问题研究,机械制造,2007.4;
[7]张毕西. 我国中小民营制造企业提升竞争力的有效途径, 统计与决策,2006.3, P151-154;
[8]张毕西. 订货生产企业任务交货期决策研究,工业工程,2004.3,102-104;
[9]张毕西. 中小民营制造企业生存与发展, 统计与决策,2004.3,114-116;
[10]张毕西. 考虑学习率的人工作业系统批量加工模式优化,系统工程理论与实践,2010.4,v30:p622-627; EI收录号:0102413003813;
[11]Zhang bixi, Stochastic Process Time Based Job Shop Dynamic Scheduling,DCDIS (2005) Proceedings of Impulsive Dynamical Systems and Applications (SCI收录: 035GT);
[12]Zhang bixi, Partner selection for car industry logistics alliance in China,Proceedings of the IEEE International Conference on Automation and Logistics, ICAL 2008, 2008, p 2069-2072. (EI收录: 084811743462);
[13]Zhang bixi, Activity Cost Based Manufacturer Cost and Profit Optimization, International Conference on Machine Learning and Cybernetics, ICMLC 2007. (EI收录: 080311030707);
[14]Zhang bi-xi, Wage System Innovation in Small and Middle Manufacture Enterprise, 2007 IEEE International Conference on Control and Automation, ICCA, 2008, p 752-756, (EI收录: 082311291238 );
[15]Zhang bixi, Study of Stochastic Job Shop Dynamic Scheduling, 2005 International Conference on Machine Learning and Cybernetics, ICMLC 2005, 911-916,(EI收录:05509538869);
[16]Zhang bixi, Effects of Processing Time Fluctuate on Scheduling Rule,2004 8th International Conference on Control,Automation, Robotics and Vision (ICARCV), v2,1507-1510(EI收录: 05159037871);
[17]Zhang bixi, Optimization of Material Flow for Manufacturing Enterprise, 2004 8th International Conference on Control, Automation, Robotics and Vision (ICARCV), v2, 1502-1506 (EI收录05159037870 );
[18]zhang bixi, Optimization of batches processing modes for manual operating system considering learning rate,
Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and PracticeXitong. vol.30, April 2010,622-627,(EI收录: 20102413003813);
[19] 张毕西,张万里,基于蚁群算法的中小手工制造企业人员调度,工业工程,2011 04,Vol.14.NO.4.P119-123.
[20]张毕西, 陈嘉,基于灰色多层次评价模型的供应链风险评估,科技与管理,2011.09.Vol13.no.5,p56-59;